{"id":14654,"date":"2026-01-22T12:07:42","date_gmt":"2026-01-22T10:07:42","guid":{"rendered":"https:\/\/www.impulso.es\/imminent-launch-of-idaes-port-eolmar-programme-which-will-offer-grants-for-investment-projects-to-physically-adapt-port-infrastructure\/"},"modified":"2026-11-06T13:21:52","modified_gmt":"2026-11-06T11:21:52","slug":"imminent-launch-of-idaes-port-eolmar-programme-which-will-offer-grants-for-investment-projects-to-physically-adapt-port-infrastructure","status":"publish","type":"post","link":"https:\/\/www.impulso.es\/en\/imminent-launch-of-idaes-port-eolmar-programme-which-will-offer-grants-for-investment-projects-to-physically-adapt-port-infrastructure\/","title":{"rendered":"IMMINENT LAUNCH OF IDAE\u2019S PORT-EOLMAR PROGRAMME, WHICH WILL OFFER GRANTS FOR INVESTMENT PROJECTS TO PHYSICALLY ADAPT PORT INFRASTRUCTURE"},"content":{"rendered":"<div class=\"wpb-content-wrapper\" id=\"wpb-content-root\"><p>[vc_row][vc_column width=&#8221;5\/6&#8243;][vc_empty_space el_class=&#8221;vc_hidden-sm vc_hidden-xs&#8221;]<div class=\"vntd-special-heading\"style=\"margin-bottom:px;\"><h1 class=\"header  font-secondary\" >IMMINENT LAUNCH OF IDAE\u2019S PORT-EOLMAR PROGRAMME, WHICH WILL OFFER GRANTS FOR INVESTMENT PROJECTS TO PHYSICALLY ADAPT PORT INFRASTRUCTURE<\/h1><div class=\"header-strips-one \" ><\/div><h2 class=\"description normal \" >With a budget of \u20ac212 million, the application period will be open from January 28 to March 3<\/h2><\/div>[vc_column_text css=&#8221;.vc_custom_1769076454197{margin-right: 20px !important;margin-left: 20px !important;padding-top: 20px !important;}&#8221;]At <strong>IMPULSO<\/strong>, we are pleased to inform you that <strong>the Institute for the Diversification and Saving of Energy (IDAE)<\/strong> will imminently open the call for the <strong>PORT-EOLMAR PROGRAMME<\/strong>, concerning<strong> GRANTS FOR INVESTMENT PROJECTS FOR THE PHYSICAL ADAPTATION OF NATIONAL PORT INFRASTRUCTURE IN PORTS OF GENERAL INTEREST FOR THE DEPLOYMENT OF OFFSHORE WIND AND OTHER MARINE RENEWABLES IN SPAIN<\/strong>, intended to award grants, under a <strong>competitive tendering<\/strong> scheme, for <u>investment projects for the physical adaptation of the basic national port infrastructure<\/u> in ports of general interest, to provide them with the appropriate capabilities for the <u>deployment of offshore wind<\/u> and other <u>marine renewable energies<\/u> and their value chain in Spain.<\/p>\n<p><!--more--><\/p>\n<p>The total budget for the call is <strong>\u20ac212M<\/strong>, distributed as follows:<\/p>\n<ul>\n<li><strong>Northeast Atlantic Region<\/strong>: Bay of Biscay and Iberian Coasts Subregion (SGV): <strong>\u20ac100M<\/strong><\/li>\n<li><strong>Northeast Atlantic Region<\/strong>: Canary Islands Macaronesian Atlantic Subregion (SAMC): <strong>\u20ac30M<\/strong><\/li>\n<li><strong>Mediterranean Sea Region<\/strong> (RMM): <strong>\u20ac82M<\/strong><\/li>\n<\/ul>\n<p>Below is a summary of the <strong>main features<\/strong> of these grants:<\/p>\n<p>&nbsp;<\/p>\n<p><strong><u>BENEFICIARIES<\/u><\/strong><\/p>\n<p>The following may qualify as beneficiary entities:<\/p>\n<ul>\n<li>The <strong>Port Authorities<\/strong> belonging to the State-owned <strong>Spanish Port System<\/strong>, provided that their area of competence is a <strong>port of general interest.<\/strong><\/li>\n<li>The <strong>groupings formed by port authorities<\/strong> which, with or without their own legal personality and adopting any of the forms provided for by law, may carry out the eligible actions.<\/li>\n<\/ul>\n<p>To qualify as a beneficiary entity, <strong>the action for which the grant is requested must be included in the port authority\u2019s current investment plan<\/strong> at the time the grant is awarded.<\/p>\n<p>&nbsp;<\/p>\n<p><strong><u>PROJECT TYPES<\/u><\/strong><\/p>\n<ul>\n<li>Public investment actions consisting of projects for <strong>berthing port infrastructure (quays)<\/strong> and <strong>the creation of areas (land reclamation to create hardstanding areas), within Zone I, and in the land areas adjacent to Zone I<\/strong>, within the service area of these ports, with sufficient capacity to accommodate <strong>activities for the manufacture, assembly and dispatch of offshore wind turbines compatible with floating technology<\/strong> that may be developed under an open use\/occupation regime for general use. <strong>Road access works and connections to general utilities<\/strong> will also be considered eligible, where necessary to enable the created areas that are not within the spaces to be granted under concession.<\/li>\n<li>Projects <strong>must include a commitment by private concessionaires to make an investment for the execution and operation of an industrial project<\/strong> with an overall investment equal to or greater than the amount of the grant requested for the infrastructure project.<\/li>\n<li><strong>Applications for \u201cmulti-port\u201d infrastructure projects will be accepted<\/strong> promoted by one or more beneficiary entities in different ports, provided that <strong>they are linked to the same overall industrial project<\/strong> that aligns the activities carried out in each of them.<\/li>\n<\/ul>\n<p>The <strong>availability in the port of the required floating areas<\/strong> must be guaranteed for maritime operations and the temporary storage of floating parts and elements, in accordance with the technology and operating conditions associated with the proposed industrial projects.<\/p>\n<p>&nbsp;<\/p>\n<p><strong><u>PROJECT REQUIREMENTS<\/u><\/strong><\/p>\n<ul>\n<li>As a result of the infrastructure project, the following <strong>minimum infrastructure capacity requirements<\/strong> must be ensured:<\/li>\n<li>Minimum number of berths: 1, at least 300 m<\/li>\n<li>Minimum length of the berthing line: 300 m<\/li>\n<li>Minimum draft at the quay and navigation channel: 15 m under maximum equinoctial spring low tide (BMVE) conditions.<\/li>\n<li>Minimum hardstanding area: 15 ha (for infrastructure projects located in the Canary Islands Macaronesian Atlantic Subregion, the minimum hardstanding area will be 10 ha).<\/li>\n<\/ul>\n<p>For multi-port infrastructure projects, at least one of the affected port locations must ensure the following minimum infrastructure capacity requirements:<\/p>\n<ul>\n<li>Minimum length of the berthing line: 300 m<\/li>\n<li>Minimum draft at the quay and navigation channel: 15 m under BMVE conditions.<\/li>\n<li>Minimum hardstanding area: 10 ha<\/li>\n<li>Only actions whose execution start date is after February 1, 2022 will be accepted.<\/li>\n<li>Only <strong>eligible<\/strong> costs associated with investment items whose physical execution starts on a <strong>date after the registration date<\/strong> of the grant application in IDAE\u2019s electronic office will be accepted.<\/li>\n<li>The actions financed under this call will comply with the \u201cdo no significant harm to the environment\u201d principle (<strong>DNSH<\/strong>)<\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<p><strong><u>ELIGIBLE COSTS<\/u><\/strong><\/p>\n<p>The following will be eligible costs, provided that they are <strong>invoiced after the grant application is registered<\/strong>:<\/p>\n<ul>\n<li>Civil works construction costs, including dredging, foundations, quay structure and superstructure, equipment and commissioning of berths, land reclamation to create hardstanding areas, including the costs of materials, machinery and labour.<\/li>\n<li>Common network costs: main access roads and connections to general utilities necessary to enable the areas.<\/li>\n<li>Associated technical assistance (works supervision, environmental monitoring, health and safety coordination, quality control, etc.), as well as costs relating to affected assets and rights and, where applicable, environmental impact mitigation measures.<\/li>\n<li>Costs of preliminary studies and project drafting, including the studies required within the applicable environmental assessment procedures.<\/li>\n<li>Costs of projects involving demolition works necessary to extend the berthing line (provided that at least 70% is prepared for reuse, recycling and recovery).<\/li>\n<li>Costs for managing the grant application and justification, and the auditor\u2019s report.<\/li>\n<li>Other items duly justified as necessary.<\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<p><strong><u>TYPE AND INTENSITY OF AID<\/u><\/strong><\/p>\n<p><strong>Non-repayable grant.<\/strong><\/p>\n<p>The aid intensity will be calculated as the ratio between the total aid and the infrastructure project budget, <strong>and may reach up to the maximum percentage of 100<\/strong><strong>% of the project\u2019s eligible costs<\/strong>.<\/p>\n<p><strong>Compatible <\/strong>with other aid.<\/p>\n<p>&nbsp;<\/p>\n<p><strong><u>GUARANTEES AND ADVANCE PAYMENTS<\/u><\/strong><\/p>\n<p>Port authorities will be <strong>exempt<\/strong> from submitting a participation and project implementation guarantee.<\/p>\n<p>In the case of an <strong>application for an advance payment of the grant<\/strong>, guarantees must be provided for an amount that must cover <strong>100<\/strong><strong>% of the advance requested<\/strong><strong> plus interest<\/strong> at the statutory interest rate.<\/p>\n<p>&nbsp;<\/p>\n<p><strong><u>SUBMISSION DEADLINE <\/u><\/strong><\/p>\n<p>Application submission period: from 12:00 on <strong>Wednesday, January 28, 2026<\/strong> until 12:00 on <strong>Tuesday, March 3, 2026<\/strong>.<\/p>\n<p><em>2026-01-22<\/em>[\/vc_column_text][\/vc_column][vc_column css_animation=&#8221;none&#8221; width=&#8221;1\/6&#8243; offset=&#8221;vc_hidden-sm vc_hidden-xs&#8221;][vc_empty_space][vc_wp_search][vc_basic_grid post_type=&#8221;post&#8221; max_items=&#8221;3&#8243; element_width=&#8221;12&#8243; item=&#8221;2633&#8243; initial_loading_animation=&#8221;none&#8221; grid_id=&#8221;vc_gid:1769076287843-47229d30-e46f-0&#8243;][\/vc_column][\/vc_row]<\/p>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>[vc_row][vc_column width=&#8221;5\/6&#8243;][vc_empty_space el_class=&#8221;vc_hidden-sm vc_hidden-xs&#8221;][vc_column_text css=&#8221;.vc_custom_1769076454197{margin-right: 20px !important;margin-left: 20px !important;padding-top: 20px !important;}&#8221;]At IMPULSO, we are pleased to inform you that the Institute for the Diversification and Saving of Energy (IDAE) will imminently open the call for the PORT-EOLMAR PROGRAMME, concerning GRANTS FOR INVESTMENT PROJECTS FOR THE PHYSICAL ADAPTATION OF NATIONAL PORT INFRASTRUCTURE IN PORTS OF GENERAL INTEREST FOR THE DEPLOYMENT OF OFFSHORE WIND AND OTHER MARINE RENEWABLES IN SPAIN, intended to [&hellip;]<\/p>\n","protected":false},"author":4,"featured_media":14136,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"rs_blank_template":"","rs_page_bg_color":"","slide_template_v7":"","footnotes":""},"categories":[283,281],"tags":[],"class_list":["post-14654","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","category-public-calls"],"rttpg_featured_image_url":{"full":["https:\/\/www.impulso.es\/wp-content\/uploads\/2026\/01\/Infraestructuras-portuarias-web.png",1117,550,false],"landscape":["https:\/\/www.impulso.es\/wp-content\/uploads\/2026\/01\/Infraestructuras-portuarias-web.png",1117,550,false],"portraits":["https:\/\/www.impulso.es\/wp-content\/uploads\/2026\/01\/Infraestructuras-portuarias-web.png",1117,550,false],"thumbnail":["https:\/\/www.impulso.es\/wp-content\/uploads\/2026\/01\/Infraestructuras-portuarias-web-150x150.png",150,150,true],"medium":["https:\/\/www.impulso.es\/wp-content\/uploads\/2026\/01\/Infraestructuras-portuarias-web-300x148.png",300,148,true],"large":["https:\/\/www.impulso.es\/wp-content\/uploads\/2026\/01\/Infraestructuras-portuarias-web-1024x504.png",1024,504,true],"1536x1536":["https:\/\/www.impulso.es\/wp-content\/uploads\/2026\/01\/Infraestructuras-portuarias-web.png",1117,550,false],"2048x2048":["https:\/\/www.impulso.es\/wp-content\/uploads\/2026\/01\/Infraestructuras-portuarias-web.png",1117,550,false],"post-thumbnail":["https:\/\/www.impulso.es\/wp-content\/uploads\/2026\/01\/Infraestructuras-portuarias-web-100x100.png",100,100,true],"bg-image":["https:\/\/www.impulso.es\/wp-content\/uploads\/2026\/01\/Infraestructuras-portuarias-web.png",1117,550,false],"fullwidth-landscape":["https:\/\/www.impulso.es\/wp-content\/uploads\/2026\/01\/Infraestructuras-portuarias-web-1117x500.png",1117,500,true],"sidebar-landscape":["https:\/\/www.impulso.es\/wp-content\/uploads\/2026\/01\/Infraestructuras-portuarias-web-880x380.png",880,380,true],"sidebar-auto":["https:\/\/www.impulso.es\/wp-content\/uploads\/2026\/01\/Infraestructuras-portuarias-web-880x433.png",880,433,true],"portfolio-square":["https:\/\/www.impulso.es\/wp-content\/uploads\/2026\/01\/Infraestructuras-portuarias-web-450x350.png",450,350,true],"portfolio-auto":["https:\/\/www.impulso.es\/wp-content\/uploads\/2026\/01\/Infraestructuras-portuarias-web-450x222.png",450,222,true],"square":["https:\/\/www.impulso.es\/wp-content\/uploads\/2026\/01\/Infraestructuras-portuarias-web-450x450.png",450,450,true]},"rttpg_author":{"display_name":"Ana Cordero","author_link":"https:\/\/www.impulso.es\/en\/author\/ana\/"},"rttpg_comment":0,"rttpg_category":"<a href=\"https:\/\/www.impulso.es\/en\/category\/news\/\" rel=\"category tag\">News<\/a> <a href=\"https:\/\/www.impulso.es\/en\/category\/public-calls\/\" rel=\"category tag\">Public calls<\/a>","rttpg_excerpt":"[vc_row][vc_column width=&#8221;5\/6&#8243;][vc_empty_space el_class=&#8221;vc_hidden-sm vc_hidden-xs&#8221;][vc_column_text css=&#8221;.vc_custom_1769076454197{margin-right: 20px !important;margin-left: 20px !important;padding-top: 20px !important;}&#8221;]At IMPULSO, we are pleased to inform you that the Institute for the Diversification and Saving of Energy (IDAE) will imminently open the call for the PORT-EOLMAR PROGRAMME, concerning GRANTS FOR INVESTMENT PROJECTS FOR THE PHYSICAL ADAPTATION OF NATIONAL PORT INFRASTRUCTURE IN PORTS OF GENERAL&hellip;","_links":{"self":[{"href":"https:\/\/www.impulso.es\/en\/wp-json\/wp\/v2\/posts\/14654","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.impulso.es\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.impulso.es\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.impulso.es\/en\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/www.impulso.es\/en\/wp-json\/wp\/v2\/comments?post=14654"}],"version-history":[{"count":3,"href":"https:\/\/www.impulso.es\/en\/wp-json\/wp\/v2\/posts\/14654\/revisions"}],"predecessor-version":[{"id":16130,"href":"https:\/\/www.impulso.es\/en\/wp-json\/wp\/v2\/posts\/14654\/revisions\/16130"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.impulso.es\/en\/wp-json\/wp\/v2\/media\/14136"}],"wp:attachment":[{"href":"https:\/\/www.impulso.es\/en\/wp-json\/wp\/v2\/media?parent=14654"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.impulso.es\/en\/wp-json\/wp\/v2\/categories?post=14654"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.impulso.es\/en\/wp-json\/wp\/v2\/tags?post=14654"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}