{"id":14934,"date":"2020-10-01T15:29:40","date_gmt":"2020-10-01T13:29:40","guid":{"rendered":"https:\/\/www.impulso.es\/asturias-call-investment-grants-for-renewable-electricity-and-thermal-energy-generation-facilities-idae\/"},"modified":"2026-11-06T14:27:48","modified_gmt":"2026-11-06T12:27:48","slug":"asturias-call-investment-grants-for-renewable-electricity-and-thermal-energy-generation-facilities-idae","status":"publish","type":"post","link":"https:\/\/www.impulso.es\/en\/asturias-call-investment-grants-for-renewable-electricity-and-thermal-energy-generation-facilities-idae\/","title":{"rendered":"ASTURIAS Call: Investment Grants for Renewable Electricity and Thermal Energy Generation Facilities (IDAE)"},"content":{"rendered":"<div class=\"wpb-content-wrapper\" id=\"wpb-content-root\"><p>[vc_row][vc_column width=&#8221;5\/6&#8243;][vc_empty_space el_class=&#8221;vc_hidden-sm vc_hidden-xs&#8221;]<div class=\"vntd-special-heading\"style=\"margin-bottom:px;\"><h1 class=\"header  font-secondary\" >ASTURIAS Call: Investment Grants for Renewable Electricity and Thermal Energy Generation Facilities (IDAE)<\/h1><div class=\"header-strips-one \" ><\/div><h2 class=\"description normal \" >Institute for Energy Diversification and Saving \u2013 IDAE<\/h2><\/div>[vc_column_text css=&#8221;.vc_custom_1601621701727{margin-right: 20px !important;margin-left: 20px !important;padding-top: 20px !important;}&#8221;]From IMPULSO, we are pleased to inform you that the <strong>Ministry for Ecological Transition and Demographic Challenge<\/strong>, through the <strong>Institute for Energy Diversification and Saving (IDAE)<\/strong>, will allocate 316 million euros to promote renewable energy facilities for both thermal and electrical energy production throughout the national territory.<\/p>\n<p><!--more--><\/p>\n<p>This grant program is implemented through <strong>calls for applications issued by IDAE in each autonomous community<\/strong>, with the call already open in <strong>ASTURIAS<\/strong>. Its purpose is the competitive awarding of <strong>grants for investment projects<\/strong> in <strong>renewable electricity generation facilities (ELECTRICITY)<\/strong> or <strong>renewable thermal energy production facilities and their management improvement and production optimization equipment (THERMAL ENERGY)<\/strong>.<\/p>\n<p>Below, we summarize the <strong>main characteristics<\/strong> of these grants:<\/p>\n<p><strong><u>BENEFICIARIES<\/u><\/strong><\/p>\n<p><strong>Natural or legal persons, public or private <\/strong>(including energy service companies in the case of THERMAL ENERGY).<\/p>\n<p>&nbsp;<\/p>\n<p><strong><u>PROJECT TYPES<\/u><\/strong><\/p>\n<ul>\n<li><strong>ELECTRICAL ENERGY: investment projects in facilities for generating electrical energy from renewable sources, <\/strong>which may include investment actions that improve management and optimize production, allowing for self-consumption and the incorporation of energy into local markets, included in the following types of facilities<strong>:<\/strong><\/li>\n<\/ul>\n<table width=\"106%\">\n<tbody>\n<tr>\n<td width=\"22%\"><strong>Energy Source<\/strong><\/td>\n<td width=\"38%\"><strong>Type of Action<\/strong><\/td>\n<td width=\"39%\"><strong>Installed Power Limit<\/strong><\/td>\n<\/tr>\n<tr>\n<td width=\"22%\">Biomass<\/td>\n<td width=\"38%\">Biomass (100% biological-origin fuels)<\/td>\n<td width=\"39%\">Regardless of capacity<\/td>\n<\/tr>\n<tr>\n<td rowspan=\"2\" width=\"22%\">Wind*<\/td>\n<td width=\"38%\">Small-scale installations<\/td>\n<td width=\"39%\">Unit power of wind turbines:<\/p>\n<p>10 kW &lt; P \u2264 100 kW<\/td>\n<\/tr>\n<tr>\n<td width=\"38%\">Very small-scale installations<\/td>\n<td width=\"39%\">Unit power of wind turbines \u2264 10 kW<\/td>\n<\/tr>\n<tr>\n<td rowspan=\"2\" width=\"22%\">Hydroelectric*<\/td>\n<td width=\"38%\">Plants with pre-existing infrastructure<\/td>\n<td width=\"39%\">1 kW \u2264 P \u2264 10 MW<\/td>\n<\/tr>\n<tr>\n<td width=\"38%\">Micro-hydroelectric installations<\/td>\n<td width=\"39%\">P &lt; 1 MW<\/td>\n<\/tr>\n<tr>\n<td rowspan=\"2\" width=\"22%\">Solar photovoltaic*<\/td>\n<td width=\"38%\">Self-consumption with storage<\/td>\n<td width=\"39%\">100 kW \u2264 P \u2264 10 MW<\/td>\n<\/tr>\n<tr>\n<td width=\"38%\">Micro self-consumption with storage<\/td>\n<td width=\"39%\">10 kW \u2264 P &lt; 100 kW<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>*modifications to existing facilities are permitted provided they have reached the end of their regulatory useful life<\/p>\n<p>&nbsp;<\/p>\n<ul>\n<li><strong>THERMAL ENERGY: investment projects in renewable thermal energy production facilities, <\/strong>included in the following types of actions linked to renewable energies:<\/li>\n<\/ul>\n<table width=\"100%\">\n<thead>\n<tr>\n<td width=\"27%\"><strong>Energy Source<\/strong><\/td>\n<td width=\"36%\"><strong>Type of Action<\/strong><\/td>\n<td width=\"36%\"><strong>Lower Nominal Power Limit (kW)<\/strong><\/td>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td rowspan=\"2\" width=\"27%\">Aerothermal<\/td>\n<td width=\"36%\">Aerothermal with residential PV<\/td>\n<td width=\"36%\">\u2265 200<\/td>\n<\/tr>\n<tr>\n<td width=\"36%\">Aerothermal with PV for services and industry<\/td>\n<td width=\"36%\">\u2265 200<\/td>\n<\/tr>\n<tr>\n<td rowspan=\"2\" width=\"27%\">Biomass<\/td>\n<td width=\"36%\">BM single building<\/td>\n<td width=\"36%\">\u2265 400<\/td>\n<\/tr>\n<tr>\n<td width=\"36%\">BM low-power industrial boilers<\/td>\n<td width=\"36%\">150 \u2264 P \u2264 5000<\/td>\n<\/tr>\n<tr>\n<td rowspan=\"2\" width=\"27%\">Geothermal or Hydrothermal<\/td>\n<td width=\"36%\">GT or HT residential<\/td>\n<td width=\"36%\">\u2265 12<\/td>\n<\/tr>\n<tr>\n<td width=\"36%\">GT or HT for services and industry<\/td>\n<td width=\"36%\">\u2265 100<\/td>\n<\/tr>\n<tr>\n<td width=\"27%\">Solar Thermal<\/td>\n<td width=\"36%\">NON-concentrating non-residential<\/td>\n<td width=\"36%\">\u2265 25<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>&nbsp;<\/p>\n<p><strong><u>ELIGIBLE COSTS<\/u><\/strong><\/p>\n<ul>\n<li><strong>ELECTRICITY<\/strong>: Preparation of the execution project, construction management, health and safety coordination, main generation equipment, civil works, foundations, unloading and storage systems, electrical and control systems, hydraulics, pumping, instrumentation, measurement, auxiliaries, monitoring, transport and assembly, commissioning, etc.<\/li>\n<li><strong>THERMAL ENERGY<\/strong>: Preparation of the execution project, thermal response tests, pumping tests, construction management, health and safety coordination, main generation equipment, accumulation systems, civil works, foundations, unloading and storage systems, heat\/cold distribution systems to consumption points, electrical and control systems, hydraulics, pumping, instrumentation, measurement, auxiliaries, monitoring, transport and assembly, commissioning, etc.<\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<p><strong><u>PROJECT REQUIREMENTS<\/u><\/strong><\/p>\n<ul>\n<li><strong>Project duration:<\/strong> the installations must be fully completed before 30 June 2023.<\/li>\n<li><strong>Incentive effect<\/strong>.<\/li>\n<\/ul>\n<ul>\n<li style=\"list-style-type: none;\"><\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<p><strong><u>TYPE AND INTENSITY OF AID<\/u><\/strong><\/p>\n<p><strong>Non-repayable grant<\/strong> that IDAE may advance to the beneficiary by means of an upfront payment.<\/p>\n<p>The amount of the granted aid will be quantified in the resolution of the procedure in terms of unit amount and total amount.<\/p>\n<p>The intensity of the aid will be calculated based on the eligible budget justified by the aid applicant, the actual installed power (electrical energy) or the actual installed nominal power (thermal energy), as well as a minimum unit contribution that will be established according to the type of action.<\/p>\n<p><strong><u>SUBMISSION DEADLINE <\/u><\/strong><\/p>\n<p>The deadline for submitting applications is <strong>until 12:00 PM on November 30, 2020<\/strong>.<\/p>\n<p>&nbsp;<\/p>\n<p><strong><u>BUDGET ALLOCATION:<\/u><\/strong><\/p>\n<p><strong>ELECTRICITY: \u20ac7,000,000.<\/strong><\/p>\n<p><strong>THERMAL ENERGY<\/strong>: <strong>\u20ac3,000,000.<\/strong><\/p>\n<p><strong> <\/strong><\/p>\n<hr>\n<p><em>01\/10\/2020<\/em>[\/vc_column_text][\/vc_column][vc_column css_animation=&#8221;left-to-right&#8221; width=&#8221;1\/6&#8243; offset=&#8221;vc_hidden-sm vc_hidden-xs&#8221;][vc_empty_space][vc_wp_search][vc_basic_grid post_type=&#8221;post&#8221; max_items=&#8221;3&#8243; element_width=&#8221;12&#8243; item=&#8221;2633&#8243; initial_loading_animation=&#8221;none&#8221; grid_id=&#8221;vc_gid:1601621665452-f693e08f-47f1-4&#8243;][\/vc_column][\/vc_row]<\/p>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>[vc_row][vc_column width=&#8221;5\/6&#8243;][vc_empty_space el_class=&#8221;vc_hidden-sm vc_hidden-xs&#8221;][vc_column_text css=&#8221;.vc_custom_1601621701727{margin-right: 20px !important;margin-left: 20px !important;padding-top: 20px !important;}&#8221;]From IMPULSO, we are pleased to inform you that the Ministry for Ecological Transition and Demographic Challenge, through the Institute for Energy Diversification and Saving (IDAE), will allocate 316 million euros to promote renewable energy facilities for both thermal and electrical energy production throughout the national territory.<\/p>\n","protected":false},"author":4,"featured_media":10190,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"rs_blank_template":"","rs_page_bg_color":"","slide_template_v7":"","footnotes":""},"categories":[283,281],"tags":[],"class_list":["post-14934","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","category-public-calls"],"rttpg_featured_image_url":{"full":["https:\/\/www.impulso.es\/wp-content\/uploads\/2020\/10\/IDAE-Asturias.png",1117,550,false],"landscape":["https:\/\/www.impulso.es\/wp-content\/uploads\/2020\/10\/IDAE-Asturias.png",1117,550,false],"portraits":["https:\/\/www.impulso.es\/wp-content\/uploads\/2020\/10\/IDAE-Asturias.png",1117,550,false],"thumbnail":["https:\/\/www.impulso.es\/wp-content\/uploads\/2020\/10\/IDAE-Asturias-150x150.png",150,150,true],"medium":["https:\/\/www.impulso.es\/wp-content\/uploads\/2020\/10\/IDAE-Asturias-300x148.png",300,148,true],"large":["https:\/\/www.impulso.es\/wp-content\/uploads\/2020\/10\/IDAE-Asturias-1024x504.png",1024,504,true],"1536x1536":["https:\/\/www.impulso.es\/wp-content\/uploads\/2020\/10\/IDAE-Asturias.png",1117,550,false],"2048x2048":["https:\/\/www.impulso.es\/wp-content\/uploads\/2020\/10\/IDAE-Asturias.png",1117,550,false],"post-thumbnail":["https:\/\/www.impulso.es\/wp-content\/uploads\/2020\/10\/IDAE-Asturias-100x100.png",100,100,true],"bg-image":["https:\/\/www.impulso.es\/wp-content\/uploads\/2020\/10\/IDAE-Asturias.png",1117,550,false],"fullwidth-landscape":["https:\/\/www.impulso.es\/wp-content\/uploads\/2020\/10\/IDAE-Asturias-1117x500.png",1117,500,true],"sidebar-landscape":["https:\/\/www.impulso.es\/wp-content\/uploads\/2020\/10\/IDAE-Asturias-880x380.png",880,380,true],"sidebar-auto":["https:\/\/www.impulso.es\/wp-content\/uploads\/2020\/10\/IDAE-Asturias-880x433.png",880,433,true],"portfolio-square":["https:\/\/www.impulso.es\/wp-content\/uploads\/2020\/10\/IDAE-Asturias-450x350.png",450,350,true],"portfolio-auto":["https:\/\/www.impulso.es\/wp-content\/uploads\/2020\/10\/IDAE-Asturias-450x222.png",450,222,true],"square":["https:\/\/www.impulso.es\/wp-content\/uploads\/2020\/10\/IDAE-Asturias-270x270.png",270,270,true]},"rttpg_author":{"display_name":"Ana Cordero","author_link":"https:\/\/www.impulso.es\/en\/author\/ana\/"},"rttpg_comment":0,"rttpg_category":"<a href=\"https:\/\/www.impulso.es\/en\/category\/news\/\" rel=\"category tag\">News<\/a> <a href=\"https:\/\/www.impulso.es\/en\/category\/public-calls\/\" rel=\"category tag\">Public calls<\/a>","rttpg_excerpt":"[vc_row][vc_column width=&#8221;5\/6&#8243;][vc_empty_space el_class=&#8221;vc_hidden-sm vc_hidden-xs&#8221;][vc_column_text css=&#8221;.vc_custom_1601621701727{margin-right: 20px !important;margin-left: 20px !important;padding-top: 20px !important;}&#8221;]From IMPULSO, we are pleased to inform you that the Ministry for Ecological Transition and Demographic Challenge, through the Institute for Energy Diversification and Saving (IDAE), will allocate 316 million euros to promote renewable energy facilities for both thermal and electrical energy production throughout the&hellip;","_links":{"self":[{"href":"https:\/\/www.impulso.es\/en\/wp-json\/wp\/v2\/posts\/14934","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.impulso.es\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.impulso.es\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.impulso.es\/en\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/www.impulso.es\/en\/wp-json\/wp\/v2\/comments?post=14934"}],"version-history":[{"count":3,"href":"https:\/\/www.impulso.es\/en\/wp-json\/wp\/v2\/posts\/14934\/revisions"}],"predecessor-version":[{"id":16094,"href":"https:\/\/www.impulso.es\/en\/wp-json\/wp\/v2\/posts\/14934\/revisions\/16094"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.impulso.es\/en\/wp-json\/wp\/v2\/media\/10190"}],"wp:attachment":[{"href":"https:\/\/www.impulso.es\/en\/wp-json\/wp\/v2\/media?parent=14934"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.impulso.es\/en\/wp-json\/wp\/v2\/categories?post=14934"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.impulso.es\/en\/wp-json\/wp\/v2\/tags?post=14934"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}