{"id":15472,"date":"2020-10-01T15:46:40","date_gmt":"2020-10-01T13:46:40","guid":{"rendered":"https:\/\/www.impulso.es\/andalusia-call-for-applications-investment-aid-for-electricity-and-thermal-energy-generation-installations-using-renewable-energy-sources-idae\/"},"modified":"2026-10-30T11:01:55","modified_gmt":"2026-10-30T09:01:55","slug":"andalusia-call-for-applications-investment-aid-for-electricity-and-thermal-energy-generation-installations-using-renewable-energy-sources-idae","status":"publish","type":"post","link":"https:\/\/www.impulso.es\/en\/andalusia-call-for-applications-investment-aid-for-electricity-and-thermal-energy-generation-installations-using-renewable-energy-sources-idae\/","title":{"rendered":"ANDALUSIA Call for Applications: Investment aid for electricity and thermal energy generation installations using renewable energy sources (IDAE)"},"content":{"rendered":"<div class=\"wpb-content-wrapper\" id=\"wpb-content-root\"><p>[vc_row][vc_column width=&#8221;5\/6&#8243;][vc_empty_space el_class=&#8221;vc_hidden-sm vc_hidden-xs&#8221;]<div class=\"vntd-special-heading\"style=\"margin-bottom:px;\"><h1 class=\"header  font-secondary\" >Convocatoria ANDALUC\u00cdA: Ayudas a la inversi\u00f3n en instalaciones de generaci\u00f3n de energ\u00eda el\u00e9ctrica y t\u00e9rmica con fuentes de energ\u00eda renovable (IDAE)<\/h1><div class=\"header-strips-one \" ><\/div><h2 class=\"description normal \" >Instituto para la Diversificaci\u00f3n y Ahorro de la Energ\u00eda \u2013 IDAE<\/h2><\/div>[vc_column_text css=&#8221;.vc_custom_1601621444545{margin-right: 20px !important;margin-left: 20px !important;padding-top: 20px !important;}&#8221;]At IMPULSO, we are pleased to inform you that the <strong>Ministry for the Ecological Transition and the Demographic Challenge<\/strong>, through the <strong>Institute for Energy Diversification and Saving (IDAE)<\/strong>, will allocate \u20ac316 million to promote renewable installations for energy production, both thermal and electrical, throughout the national territory.<\/p>\n<p><!--more--><\/p>\n<p>This aid programme is implemented through <strong>calls issued by IDAE in each autonomous community<\/strong>. It is already open in <strong>ANDALUSIA<\/strong>, and its purpose is to award, under a competitive tendering procedure, <strong>grants for investment projects<\/strong> in <strong>electricity generation installations using renewable energy sources (ELECTRICITY)<\/strong> or <strong>thermal energy production installations using renewable energy sources, including their management improvement and production optimisation equipment (THERMAL ENERGY)<\/strong>.<\/p>\n<p>Below is a summary of the <strong>main features<\/strong> of these grants:<\/p>\n<p>&nbsp;<\/p>\n<p><strong><u>BENEFICIARIES<\/u><\/strong><\/p>\n<p><strong>Natural or legal persons, public or private<\/strong> (including energy service companies in the case of THERMAL ENERGY).<\/p>\n<p>&nbsp;<\/p>\n<p><strong><u>PROJECT TYPES<\/u><\/strong><\/p>\n<ul>\n<li><strong>ELECTRICITY: investment projects in electricity generation installations using biogas, biomass, wind or solar photovoltaic energy,<\/strong> which may include investment actions to improve management and optimise production, enabling self-consumption and the integration of energy into local markets, included in the following types of installations:<\/li>\n<\/ul>\n<table width=\"100%\">\n<thead>\n<tr>\n<td width=\"27%\"><strong>Energy source<\/strong><\/td>\n<td width=\"36%\"><strong>Type of action<\/strong><\/td>\n<td width=\"36%\"><strong>Installed capacity limit<\/strong><\/td>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td rowspan=\"2\" width=\"27%\">Renewable gases<\/td>\n<td width=\"36%\">Agro-industrial or industrial biogas (electricity generation and use)<\/td>\n<td rowspan=\"3\" width=\"36%\">Regardless of capacity<\/td>\n<\/tr>\n<tr>\n<td width=\"36%\">Agro-industrial or industrial biogas installations (electricity use only)<\/td>\n<\/tr>\n<tr>\n<td width=\"27%\">Biomass<\/td>\n<td width=\"36%\">Biomass (100% biologically sourced fuels)<\/td>\n<\/tr>\n<tr>\n<td rowspan=\"4\" width=\"27%\">Wind<\/td>\n<td width=\"36%\">Onshore wind installation with hydrogen production\/storage<\/td>\n<td width=\"36%\">Wind turbines with unit capacity &gt; 100 kW<\/td>\n<\/tr>\n<tr>\n<td width=\"36%\">Small-scale wind installations<\/td>\n<td width=\"36%\">Wind turbines with unit capacity<\/p>\n<p>10 &lt; P \u2264 100 kW<\/td>\n<\/tr>\n<tr>\n<td width=\"36%\">Very small-scale wind installations<\/td>\n<td width=\"36%\">Wind turbines with unit capacity \u2264 10 kW<\/td>\n<\/tr>\n<tr>\n<td width=\"36%\">Very small-scale wind installations for self-consumption with energy supply for charging electric vehicles<\/td>\n<td width=\"36%\">Wind turbines with unit capacity \u2264 10 kW<\/td>\n<\/tr>\n<tr>\n<td rowspan=\"11\" width=\"27%\">Solar photovoltaic<\/td>\n<td width=\"36%\">Micro self-consumption WITHOUT storage<\/td>\n<td width=\"36%\">10 kW \u2264 P \u2264 100 kW<\/td>\n<\/tr>\n<tr>\n<td width=\"36%\">Small high-output installations for self-consumption WITHOUT storage in industry<\/td>\n<td width=\"36%\">100 kW \u2264 P &lt; 1 MW<\/td>\n<\/tr>\n<tr>\n<td width=\"36%\">Medium high-output installations for self-consumption WITHOUT storage in industry<\/td>\n<td width=\"36%\">1 MW \u2264 P<\/td>\n<\/tr>\n<tr>\n<td width=\"36%\">Large high-output installations for self-consumption WITH storage in industry<\/td>\n<td width=\"36%\">100 kW \u2264 P \u2264 10 MW<\/td>\n<\/tr>\n<tr>\n<td width=\"36%\">Self-consumption installations for seasonal industries WITHOUT storage<\/td>\n<td width=\"36%\">100 kW \u2264 P \u2264 10 MW<\/td>\n<\/tr>\n<tr>\n<td width=\"36%\">Small-capacity installations for grid sale WITH storage<\/td>\n<td width=\"36%\">100 kW \u2264 P \u2264 1 MW<\/td>\n<\/tr>\n<tr>\n<td width=\"36%\">Self-consumption installations WITH storage<\/td>\n<td width=\"36%\">100 kW \u2264 P \u2264 10 MW<\/td>\n<\/tr>\n<tr>\n<td width=\"36%\">Self-consumption installations with energy supply for charging electric vehicles<\/td>\n<td width=\"36%\">50 kW \u2264 P \u2264 300 kW<\/td>\n<\/tr>\n<tr>\n<td width=\"36%\">Photovoltaic installations with hydrogen<\/td>\n<td width=\"36%\">1 MW \u2264 P \u2264 10 MW<\/td>\n<\/tr>\n<tr>\n<td width=\"36%\">Self-consumption installations WITH storage in Science and Technology Parks<\/td>\n<td width=\"36%\">20 kW \u2264 P \u2264 1 MW<\/td>\n<\/tr>\n<tr>\n<td width=\"36%\">Self-consumption installations WITHOUT storage in companies\/entities within the food distribution sector<\/td>\n<td width=\"36%\">50 kW \u2264 P \u2264 10 MW<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>&nbsp;<\/p>\n<ul>\n<li><strong>THERMAL ENERGY: investment projects in thermal energy production installations using renewable energy sources and in renewable gas production installations,<\/strong> included in the following types of actions linked to renewable energies:<\/li>\n<\/ul>\n<table width=\"117%\">\n<thead>\n<tr>\n<td width=\"27%\"><strong>Energy source<\/strong><\/td>\n<td width=\"36%\"><strong>Type of action<\/strong><\/td>\n<td width=\"36%\"><strong>Lower\/upper limit of nominal capacity<\/strong><\/td>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td width=\"27%\">Air-source heat pump<\/td>\n<td width=\"36%\">Air-source heat pump + photovoltaic services for air conditioning and air purification<\/td>\n<td width=\"36%\">\u2265 200 kW<\/td>\n<\/tr>\n<tr>\n<td rowspan=\"3\" width=\"27%\">Biomass<\/td>\n<td width=\"36%\">Industrial combustion chamber<\/td>\n<td width=\"36%\">\u2265 1 MW<\/td>\n<\/tr>\n<tr>\n<td width=\"36%\">Low-capacity industrial boilers<\/td>\n<td width=\"36%\">&lt; 5 MW<\/td>\n<\/tr>\n<tr>\n<td width=\"36%\">High-capacity industrial boilers<\/td>\n<td width=\"36%\">\u2265 5 MW<\/td>\n<\/tr>\n<tr>\n<td rowspan=\"3\" width=\"27%\">Renewable gases<\/td>\n<td width=\"36%\">Biogas production plants including thermal generation for process use in high-capacity industrial applications<\/td>\n<td width=\"36%\">\u2265 5 MW<\/td>\n<\/tr>\n<tr>\n<td width=\"36%\">Boilers for thermal generation that use exclusively biogas as fuel<\/td>\n<td rowspan=\"2\" width=\"36%\">Regardless of capacity<\/td>\n<\/tr>\n<tr>\n<td width=\"36%\">Biomethane (including purification only)<\/td>\n<\/tr>\n<tr>\n<td rowspan=\"2\" width=\"27%\">Geothermal or hydrothermal<\/td>\n<td width=\"36%\">Geothermal or hydrothermal services and industry<\/td>\n<td rowspan=\"2\" width=\"36%\">\u2265 100 kW<\/td>\n<\/tr>\n<tr>\n<td width=\"36%\">Geothermal direct use for thermal energy distribution network<\/td>\n<\/tr>\n<tr>\n<td rowspan=\"4\" width=\"27%\">Solar thermal<\/td>\n<td width=\"36%\">WITH concentration<\/td>\n<td width=\"36%\">25 kW \u2264 P &lt; 5 MW<\/td>\n<\/tr>\n<tr>\n<td width=\"36%\">WITH concentration<\/td>\n<td width=\"36%\">\u2265 5 MW<\/td>\n<\/tr>\n<tr>\n<td width=\"36%\">WITHOUT concentration<\/td>\n<td width=\"36%\">25 kW \u2264 P &lt; 100 kW<\/td>\n<\/tr>\n<tr>\n<td width=\"36%\">WITHOUT concentration<\/td>\n<td width=\"36%\">\u2265 100 kW<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>&nbsp;<\/p>\n<p><strong><u>ELIGIBLE COSTS<\/u><\/strong><\/p>\n<ul>\n<li><strong>ELECTRICITY<\/strong>: Preparation of the detailed design project, site supervision, health and safety coordination, main generation equipment, civil works, foundations, unloading and storage systems, electrical and control systems, hydraulic systems, pumping, instrumentation, metering, auxiliary equipment, monitoring, transport and assembly, commissioning, etc.<\/li>\n<li><strong>THERMAL ENERGY<\/strong>: Preparation of the detailed design project, thermal response test trials, pumping tests, site supervision, health and safety coordination, main generation equipment, civil works, foundations, unloading and storage systems, heat\/cold distribution systems to consumption points, grid injection systems, high-pressure compression and storage systems for compressed renewable gases, electrical and control systems, hydraulic systems, pumping, instrumentation, metering, auxiliary equipment, monitoring, transport and assembly, commissioning, etc.<\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<p><strong><u>PROJECT REQUIREMENTS<\/u><\/strong><\/p>\n<ul>\n<li><strong>Project duration:<\/strong> the installations must be fully completed before 30 June 2023.<\/li>\n<li><strong>Incentive effect<\/strong>.<\/li>\n<\/ul>\n<ul>\n<li style=\"list-style-type: none;\"><\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<p><strong><u>TYPE AND INTENSITY OF AID<\/u><\/strong><\/p>\n<p><strong>Non-repayable grant<\/strong> that IDAE may advance to the beneficiary by means of an upfront payment.<\/p>\n<p>The amount of the aid granted will be set out in the procedure\u2019s decision in terms of unit amount and total amount.<\/p>\n<p>The aid intensity will be calculated based on the eligible budget substantiated by the applicant, the actual installed capacity, as well as a minimum unit contribution to be established depending on the type of action.<\/p>\n<p><strong><u>SUBMISSION DEADLINE<\/u><\/strong><\/p>\n<p>The deadline for submitting applications is <strong>until 12:00 on 23 November 2020<\/strong>.<\/p>\n<p>&nbsp;<\/p>\n<p><strong><u>BUDGET ALLOCATION:<\/u><\/strong><\/p>\n<p><strong>ELECTRICITY: \u20ac50,588,867.<\/strong> <strong> <\/strong><\/p>\n<p><strong>THERMAL ENERGY: \u20ac73,700,000. <\/strong><\/p>\n<p><strong> <\/strong><\/p>\n<p><strong> <\/strong><\/p>\n<hr>\n<p><em>01\/10\/2020<\/em>[\/vc_column_text][\/vc_column][vc_column css_animation=&#8221;left-to-right&#8221; width=&#8221;1\/6&#8243; offset=&#8221;vc_hidden-sm vc_hidden-xs&#8221;][vc_empty_space][vc_wp_search][vc_basic_grid post_type=&#8221;post&#8221; max_items=&#8221;3&#8243; element_width=&#8221;12&#8243; item=&#8221;2633&#8243; initial_loading_animation=&#8221;none&#8221; grid_id=&#8221;vc_gid:1601621392150-2e642ea2-6e7e-4&#8243;][\/vc_column][\/vc_row]<\/p>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>[vc_row][vc_column width=&#8221;5\/6&#8243;][vc_empty_space el_class=&#8221;vc_hidden-sm vc_hidden-xs&#8221;][vc_column_text css=&#8221;.vc_custom_1601621444545{margin-right: 20px !important;margin-left: 20px !important;padding-top: 20px !important;}&#8221;]At IMPULSO, we are pleased to inform you that the Ministry for the Ecological Transition and the Demographic Challenge, through the Institute for Energy Diversification and Saving (IDAE), will allocate \u20ac316 million to promote renewable installations for energy production, both thermal and electrical, throughout the national territory.<\/p>\n","protected":false},"author":4,"featured_media":10199,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"rs_blank_template":"","rs_page_bg_color":"","slide_template_v7":"","footnotes":""},"categories":[283,281],"tags":[],"class_list":["post-15472","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","category-public-calls"],"rttpg_featured_image_url":{"full":["https:\/\/www.impulso.es\/wp-content\/uploads\/2020\/10\/IDAE-Andalucia.png",1117,550,false],"landscape":["https:\/\/www.impulso.es\/wp-content\/uploads\/2020\/10\/IDAE-Andalucia.png",1117,550,false],"portraits":["https:\/\/www.impulso.es\/wp-content\/uploads\/2020\/10\/IDAE-Andalucia.png",1117,550,false],"thumbnail":["https:\/\/www.impulso.es\/wp-content\/uploads\/2020\/10\/IDAE-Andalucia-150x150.png",150,150,true],"medium":["https:\/\/www.impulso.es\/wp-content\/uploads\/2020\/10\/IDAE-Andalucia-300x148.png",300,148,true],"large":["https:\/\/www.impulso.es\/wp-content\/uploads\/2020\/10\/IDAE-Andalucia-1024x504.png",1024,504,true],"1536x1536":["https:\/\/www.impulso.es\/wp-content\/uploads\/2020\/10\/IDAE-Andalucia.png",1117,550,false],"2048x2048":["https:\/\/www.impulso.es\/wp-content\/uploads\/2020\/10\/IDAE-Andalucia.png",1117,550,false],"post-thumbnail":["https:\/\/www.impulso.es\/wp-content\/uploads\/2020\/10\/IDAE-Andalucia-100x100.png",100,100,true],"bg-image":["https:\/\/www.impulso.es\/wp-content\/uploads\/2020\/10\/IDAE-Andalucia.png",1117,550,false],"fullwidth-landscape":["https:\/\/www.impulso.es\/wp-content\/uploads\/2020\/10\/IDAE-Andalucia-1117x500.png",1117,500,true],"sidebar-landscape":["https:\/\/www.impulso.es\/wp-content\/uploads\/2020\/10\/IDAE-Andalucia-880x380.png",880,380,true],"sidebar-auto":["https:\/\/www.impulso.es\/wp-content\/uploads\/2020\/10\/IDAE-Andalucia-880x433.png",880,433,true],"portfolio-square":["https:\/\/www.impulso.es\/wp-content\/uploads\/2020\/10\/IDAE-Andalucia-450x350.png",450,350,true],"portfolio-auto":["https:\/\/www.impulso.es\/wp-content\/uploads\/2020\/10\/IDAE-Andalucia-450x222.png",450,222,true],"square":["https:\/\/www.impulso.es\/wp-content\/uploads\/2020\/10\/IDAE-Andalucia-270x270.png",270,270,true]},"rttpg_author":{"display_name":"Ana Cordero","author_link":"https:\/\/www.impulso.es\/en\/author\/ana\/"},"rttpg_comment":0,"rttpg_category":"<a href=\"https:\/\/www.impulso.es\/en\/category\/news\/\" rel=\"category tag\">News<\/a> <a href=\"https:\/\/www.impulso.es\/en\/category\/public-calls\/\" rel=\"category tag\">Public calls<\/a>","rttpg_excerpt":"[vc_row][vc_column width=&#8221;5\/6&#8243;][vc_empty_space el_class=&#8221;vc_hidden-sm vc_hidden-xs&#8221;][vc_column_text css=&#8221;.vc_custom_1601621444545{margin-right: 20px !important;margin-left: 20px !important;padding-top: 20px !important;}&#8221;]At IMPULSO, we are pleased to inform you that the Ministry for the Ecological Transition and the Demographic Challenge, through the Institute for Energy Diversification and Saving (IDAE), will allocate \u20ac316 million to promote renewable installations for energy production, both thermal and electrical, throughout the&hellip;","_links":{"self":[{"href":"https:\/\/www.impulso.es\/en\/wp-json\/wp\/v2\/posts\/15472","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.impulso.es\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.impulso.es\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.impulso.es\/en\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/www.impulso.es\/en\/wp-json\/wp\/v2\/comments?post=15472"}],"version-history":[{"count":5,"href":"https:\/\/www.impulso.es\/en\/wp-json\/wp\/v2\/posts\/15472\/revisions"}],"predecessor-version":[{"id":15477,"href":"https:\/\/www.impulso.es\/en\/wp-json\/wp\/v2\/posts\/15472\/revisions\/15477"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.impulso.es\/en\/wp-json\/wp\/v2\/media\/10199"}],"wp:attachment":[{"href":"https:\/\/www.impulso.es\/en\/wp-json\/wp\/v2\/media?parent=15472"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.impulso.es\/en\/wp-json\/wp\/v2\/categories?post=15472"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.impulso.es\/en\/wp-json\/wp\/v2\/tags?post=15472"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}