{"id":17196,"date":"2026-11-11T14:12:38","date_gmt":"2026-11-11T12:12:38","guid":{"rendered":"https:\/\/www.impulso.es\/the-ministry-of-housing-and-urban-agenda-has-approved-the-regulatory-bases-for-grants-to-promote-industrialized-housing-construction\/"},"modified":"2026-11-11T14:37:51","modified_gmt":"2026-11-11T12:37:51","slug":"the-ministry-of-housing-and-urban-agenda-has-approved-the-regulatory-bases-for-grants-to-promote-industrialized-housing-construction","status":"publish","type":"post","link":"https:\/\/www.impulso.es\/en\/the-ministry-of-housing-and-urban-agenda-has-approved-the-regulatory-bases-for-grants-to-promote-industrialized-housing-construction\/","title":{"rendered":"The Ministry of Housing and Urban Agenda has approved the regulatory bases for grants to promote industrialized housing construction"},"content":{"rendered":"<div class=\"wpb-content-wrapper\" id=\"wpb-content-root\"><p>[vc_row][vc_column width=&#8221;5\/6&#8243;][vc_empty_space el_class=&#8221;vc_hidden-sm vc_hidden-xs&#8221;]<div class=\"vntd-special-heading\"style=\"margin-bottom:px;\"><h1 class=\"header  font-secondary\" >The Ministry of Housing and Urban Agenda has approved the regulatory bases for grants to promote industrialized housing construction<\/h1><div class=\"header-strips-one \" ><\/div><h2 class=\"description normal \" >Regulatory bases in Order VAU\/1195\/2026 (BOE of November 10), within the framework of the PERTE for Housing Industrialization<\/h2><\/div>[vc_column_text css=&#8221;.vc_custom_1794398593302{margin-right: 20px !important;margin-left: 20px !important;padding-top: 20px !important;}&#8221;]IMPULSO informs you that Order VAU\/1195\/2026 has been published in the Official State Gazette (BOE), establishing the regulatory bases for the Ministry of Housing and Urban Agenda\u2019s grants to promote industrialized construction in Spain.<\/p>\n<p><!--more--><\/p>\n<p>This is a nationwide instrument, under a competitive procedure, to be rolled out through successive calls across three lines:<br \/>\n1. Innovation in processes and organization, aimed at SMEs: up to \u20ac5M per project.<br \/>\n2. Industrial research and experimental development, including the development of prototypes: up to \u20ac1M and \u20ac2M per project, respectively.<br \/>\n3. Technical assessment and validation of innovative products: up to \u20ac50,000 per project.<\/p>\n<p>The aim is to accelerate the sector\u2019s modernization: incorporate new technologies and construction solutions, improve productivity and efficiency, and strengthen the competitiveness of the value chain.<\/p>\n<table width=\"100%\">\n<tbody>\n<tr>\n<td width=\"93%\"><strong>PROGRAM PURPOSE<\/strong><\/td>\n<td width=\"6%\"><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>Award of public grants to projects and activities aimed at promoting <strong>industrialized housing construction<\/strong>, in particular:<\/p>\n<ul>\n<li>The manufacture of industrialized components intended for residential-use buildings.<\/li>\n<li>The integration or assembly of systems or construction solutions intended for industrialized housing construction.<\/li>\n<li>Technological development, digitization, automation, or robotization of industrial processes applied to industrialized housing construction.<\/li>\n<\/ul>\n<table width=\"100%\">\n<tbody>\n<tr>\n<td width=\"6%\"><\/td>\n<td width=\"93%\"><strong>BENEFICIARIES<\/strong><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<ul>\n<li>Commercial companies with their own legal personality, legally incorporated in Spain, that carry out economic activities <u>linked to industrialized housing construction<\/u>.<\/li>\n<li>Entities <strong><u>with<\/u><\/strong> their own legal personality, formed by several participating entities, provided they meet the requirements set out in this order.<\/li>\n<\/ul>\n<p>An entity will be deemed to carry out economic activities linked to industrialized construction when it can evidence having carried them out for a minimum period of <strong><u>two years<\/u><\/strong>, counted up to the end date of the application submission period.<\/p>\n<p>Activities considered especially linked to industrialized construction are those falling under <strong>CNAE-2025 codes 16.29, 23.68 and 25.14.<\/strong> However, belonging to these codes will not be an exclusive requirement to access the aid, and projects may be submitted under other related CNAE codes.<\/p>\n<table width=\"100%\">\n<tbody>\n<tr>\n<td width=\"93%\"><strong>PROJECT TYPES<\/strong><\/td>\n<td width=\"6%\"><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<ul>\n<li><strong>Line 1:<\/strong> Innovation in processes and organization in industrialized housing construction. <u>SMEs only<\/u>. It will fund projects that incorporate one or more of the following characteristics:\n<ul>\n<li>a) Implementation of new or significantly improved production or <strong>industrial organization<\/strong> models compared to those previously existing at the establishment.<\/li>\n<li>b) Implementation of <strong>automation, robotization, or advanced process integration<\/strong> systems involving the adoption of new or significantly improved production methods.<\/li>\n<li>c) Implementation of digital solutions that transform <strong>planning, management, traceability, control, or coordination of the production, logistics, or quality process<\/strong>, significantly modifying the establishment\u2019s operating model.<\/li>\n<li>d) Adoption of new or significantly improved methods in <strong>logistics, assembly, or industrial coordination processes<\/strong> that directly impact overall efficiency, scalability, or the operating capacity of the production system.<\/li>\n<\/ul>\n<\/li>\n<li><strong>Line 2:<\/strong> R&amp;D&amp;I in industrialized housing construction.\n<ul>\n<li>Research projects.<\/li>\n<li>Development projects.<\/li>\n<\/ul>\n<\/li>\n<li><strong>Line 3:<\/strong> Technical assessment and validation of innovative industrialized housing construction products.<\/li>\n<\/ul>\n<table width=\"99%\">\n<tbody>\n<tr>\n<td width=\"6%\"><\/td>\n<td width=\"93%\"><strong>PROJECT REQUIREMENTS<\/strong><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<ul>\n<li>The actions included in each application must be carried out at <u>the same industrial establishment<\/u>.<\/li>\n<li>Testing, demonstrations, proof-of-concept activities, validations, or pilot activities at different sites are permitted when such actions constitute necessary phases for the execution of the funded project.<\/li>\n<\/ul>\n<table width=\"100%\">\n<tbody>\n<tr>\n<td width=\"93%\"><strong>ELIGIBLE COSTS<\/strong><\/td>\n<td width=\"6%\"><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<ul>\n<li><strong>Lines 1 and 2:<\/strong>\n<ul>\n<li>Personnel costs<\/li>\n<li>Depreciation of assets.<\/li>\n<li>Subcontracting (max. 90% of the budget).<\/li>\n<li>Overheads (15% of the personnel item). Includes materials.<\/li>\n<li>Under line 2, specific consultancy costs for the project are eligible.<\/li>\n<\/ul>\n<\/li>\n<li><strong>Line 3:<\/strong>\n<ul>\n<li>Personnel costs<\/li>\n<li>Consultancy, technical assistance, and specialized external services necessary for the execution of the project.<\/li>\n<li>Overheads (15% of the personnel item).<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n<table width=\"99%\">\n<tbody>\n<tr>\n<td width=\"6%\"><\/td>\n<td width=\"93%\"><strong>TYPE AND INTENSITY OF AID<\/strong><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<ul>\n<li><strong>Line 1: <\/strong>\n<ul>\n<li>50% grant.<\/li>\n<li>Up to \u20ac5M in aid per project and beneficiary.<\/li>\n<li>Minimum project budget: \u20ac500,000<\/li>\n<\/ul>\n<\/li>\n<li><strong>Line 2:<\/strong>\n<ul>\n<li>Research:\n<ul>\n<li>Grant of up to 80%, depending on size.<\/li>\n<li>Up to \u20ac1M in aid per project and beneficiary.<\/li>\n<li>Minimum project budget: \u20ac250,000.<\/li>\n<\/ul>\n<\/li>\n<li>Development:\n<ul>\n<li>Grant of up to 60%, depending on size.<\/li>\n<li>Up to \u20ac2M in aid per project and beneficiary entity.<\/li>\n<li>Minimum project budget: \u20ac500,000.<\/li>\n<\/ul>\n<\/li>\n<li><strong>Line 3<\/strong> (de minimis aid):\n<ul>\n<li>Up to \u20ac50,000 in aid per project and beneficiary.<\/li>\n<li>Minimum budget: \u20ac35,000.<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n<table width=\"99%\">\n<tbody>\n<tr>\n<td width=\"93%\"><strong>PAYMENT of the Aid and GUARANTEES<\/strong><\/td>\n<td width=\"6%\"><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<ul>\n<li>Payment will be made through a single disbursement for the full amount of the grant, in advance, subject to prior compliance with the requirements for receiving it.<\/li>\n<li>A guarantee must be provided prior to payment for that amount.<\/li>\n<\/ul>\n<table width=\"100%\">\n<tbody>\n<tr>\n<td width=\"7%\"><\/td>\n<td width=\"92%\"><strong>MORE INFORMATION<\/strong><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<ul>\n<li>Applicant entities must have filed the annual accounts for the last two closed and approved financial years with the competent Mercantile Registry<\/li>\n<li>Incompatible with other aid for the same costs included in the budget.<\/li>\n<li>Independent annual calls may be issued, with different application deadlines, for the different lines of action.<\/li>\n<li><strong><u>Incentive effect.<\/u><\/strong> Costs for actions or investments started prior to submitting the aid application will not be eligible.<\/li>\n<li>Aid under a <strong>competitive procedure<\/strong>.<\/li>\n<li>Costs for the acquisition of second-hand fixed assets will not be eligible.<\/li>\n<li><strong>Application submission<\/strong> deadline: pending publication of the calls. The maximum period for submitting applications will be 2 months from publication of the call.<\/li>\n<li>Obligation to keep separate accounts.<\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<p><em> 11<\/em><em>\/11\/2026<\/em>[\/vc_column_text][\/vc_column][vc_column css_animation=&#8221;left-to-right&#8221; width=&#8221;1\/6&#8243; offset=&#8221;vc_hidden-sm vc_hidden-xs&#8221;][vc_empty_space][vc_wp_search][vc_basic_grid item=&#8221;2633&#8243; post_type=&#8221;post&#8221; max_items=&#8221;3&#8243; initial_loading_animation=&#8221;none&#8221; element_width=&#8221;12&#8243; grid_id=&#8221;vc_gid:1794399670677-bc04843b-a16b-3&#8243;][\/vc_column][\/vc_row]<\/p>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>[vc_row][vc_column width=&#8221;5\/6&#8243;][vc_empty_space el_class=&#8221;vc_hidden-sm vc_hidden-xs&#8221;][vc_column_text css=&#8221;.vc_custom_1794398593302{margin-right: 20px !important;margin-left: 20px !important;padding-top: 20px !important;}&#8221;]IMPULSO informs you that Order VAU\/1195\/2026 has been published in the Official State Gazette (BOE), establishing the regulatory bases for the Ministry of Housing and Urban Agenda\u2019s grants to promote industrialized construction in Spain.<\/p>\n","protected":false},"author":4,"featured_media":17187,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"rs_blank_template":"","rs_page_bg_color":"","slide_template_v7":"","footnotes":""},"categories":[283,281],"tags":[],"class_list":["post-17196","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","category-public-calls"],"rttpg_featured_image_url":{"full":["https:\/\/www.impulso.es\/wp-content\/uploads\/2026\/11\/Perte-Vivienda-Web.png",1117,550,false],"landscape":["https:\/\/www.impulso.es\/wp-content\/uploads\/2026\/11\/Perte-Vivienda-Web.png",1117,550,false],"portraits":["https:\/\/www.impulso.es\/wp-content\/uploads\/2026\/11\/Perte-Vivienda-Web.png",1117,550,false],"thumbnail":["https:\/\/www.impulso.es\/wp-content\/uploads\/2026\/11\/Perte-Vivienda-Web-150x150.png",150,150,true],"medium":["https:\/\/www.impulso.es\/wp-content\/uploads\/2026\/11\/Perte-Vivienda-Web-300x148.png",300,148,true],"large":["https:\/\/www.impulso.es\/wp-content\/uploads\/2026\/11\/Perte-Vivienda-Web-1024x504.png",1024,504,true],"1536x1536":["https:\/\/www.impulso.es\/wp-content\/uploads\/2026\/11\/Perte-Vivienda-Web.png",1117,550,false],"2048x2048":["https:\/\/www.impulso.es\/wp-content\/uploads\/2026\/11\/Perte-Vivienda-Web.png",1117,550,false],"post-thumbnail":["https:\/\/www.impulso.es\/wp-content\/uploads\/2026\/11\/Perte-Vivienda-Web-100x100.png",100,100,true],"bg-image":["https:\/\/www.impulso.es\/wp-content\/uploads\/2026\/11\/Perte-Vivienda-Web.png",1117,550,false],"fullwidth-landscape":["https:\/\/www.impulso.es\/wp-content\/uploads\/2026\/11\/Perte-Vivienda-Web-1117x500.png",1117,500,true],"sidebar-landscape":["https:\/\/www.impulso.es\/wp-content\/uploads\/2026\/11\/Perte-Vivienda-Web-880x380.png",880,380,true],"sidebar-auto":["https:\/\/www.impulso.es\/wp-content\/uploads\/2026\/11\/Perte-Vivienda-Web-880x433.png",880,433,true],"portfolio-square":["https:\/\/www.impulso.es\/wp-content\/uploads\/2026\/11\/Perte-Vivienda-Web-450x350.png",450,350,true],"portfolio-auto":["https:\/\/www.impulso.es\/wp-content\/uploads\/2026\/11\/Perte-Vivienda-Web-450x222.png",450,222,true],"square":["https:\/\/www.impulso.es\/wp-content\/uploads\/2026\/11\/Perte-Vivienda-Web-450x450.png",450,450,true]},"rttpg_author":{"display_name":"Ana Cordero","author_link":"https:\/\/www.impulso.es\/en\/author\/ana\/"},"rttpg_comment":0,"rttpg_category":"<a href=\"https:\/\/www.impulso.es\/en\/category\/news\/\" rel=\"category tag\">News<\/a> <a href=\"https:\/\/www.impulso.es\/en\/category\/public-calls\/\" rel=\"category tag\">Public calls<\/a>","rttpg_excerpt":"[vc_row][vc_column width=&#8221;5\/6&#8243;][vc_empty_space el_class=&#8221;vc_hidden-sm vc_hidden-xs&#8221;][vc_column_text css=&#8221;.vc_custom_1794398593302{margin-right: 20px !important;margin-left: 20px !important;padding-top: 20px !important;}&#8221;]IMPULSO informs you that Order VAU\/1195\/2026 has been published in the Official State Gazette (BOE), establishing the regulatory bases for the Ministry of Housing and Urban Agenda\u2019s grants to promote industrialized construction in Spain.","_links":{"self":[{"href":"https:\/\/www.impulso.es\/en\/wp-json\/wp\/v2\/posts\/17196","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.impulso.es\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.impulso.es\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.impulso.es\/en\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/www.impulso.es\/en\/wp-json\/wp\/v2\/comments?post=17196"}],"version-history":[{"count":2,"href":"https:\/\/www.impulso.es\/en\/wp-json\/wp\/v2\/posts\/17196\/revisions"}],"predecessor-version":[{"id":17198,"href":"https:\/\/www.impulso.es\/en\/wp-json\/wp\/v2\/posts\/17196\/revisions\/17198"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.impulso.es\/en\/wp-json\/wp\/v2\/media\/17187"}],"wp:attachment":[{"href":"https:\/\/www.impulso.es\/en\/wp-json\/wp\/v2\/media?parent=17196"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.impulso.es\/en\/wp-json\/wp\/v2\/categories?post=17196"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.impulso.es\/en\/wp-json\/wp\/v2\/tags?post=17196"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}