The project for this steel complex starts from existing industrial buildings that are being adapted to the new activity and develops a series of new constructions necessary for this industrial process. These facilities include pickling, rolling, and galvanizing lines for steel coils, each with its own building; these buildings are designed with all the requirements demanded by the processes and machinery, both in terms of the building envelope (above and below ground) and in terms of installations and services; of particular note is the construction of an elevated area of the galvanizing building, 43 meters high. Within the plant, another series of auxiliary facilities are designed and built, such as an acid treatment plant, gas storage plants, or a water treatment plant.

To accommodate all the needs derived from the process, it was necessary to reconfigure the original plot by adding adjacent land.

Linked to this industrial activity, a railway branch line is being executed that will reach the interior of the plot, optimizing the inflow of raw materials and the outflow of finished products; to adapt the deadlines of this work to the production rates, a provisional halt was designed and executed to the south of the industrial estate.

 

Functions developed

  • Preliminary Design
  • Basic and Execution Project
  • Segregation and aggregation of plots.
  • Basic Engineering
  • Detailed Engineering
  • Global Assistance
  • Construction Management

Project
Steel-related industrial complex

Developer
Leon Coated Solutions, S.L.

Location
Villadangos del Páramo, León

Project completion date
October 2018

Construction completion date
April 2026

Total area of intervention
124,030 m2