
NEW INDUSTRIAL PLANT FOR GLASS TRANSFORMING TECHNOLOGY IN PONFERRADA, LEÓN
Description
This plant is dedicated to the technological transformation of flat glass into high value-added products for the distinctive building sector. The project has been designed to allow for future expansions of the industrial floor area. The office building is independent from the production area.
This is a large-scale industrial building, specifically designed to optimize process flows. Special attention has been paid to construction solutions for the flooring, which is subject to particularly demanding service conditions, both in relation to the static loads caused by glass stacking and those caused by the industrial vehicles involved in the production process.
Services
- Drafting and comprehensive management of engineering projects: project planning, business activity project, construction project (including installation projects, health and safety studies, health and safety coordination).
- Comprehensive supervision and management of construction works.
Project
NEW INDUSTRIAL PLANT FOR GLASS TRANSFORMING TECHNOLOGY IN PONFERRADA, LEÓN
Promoter
Técnicas del Vidrio Transformado, S.L. (TVITEC)
Location
Bayo Industrial Park, Cubillos del Sil, Ponferrada, León
Project end date
January 2008
Completion date
July 2008
Total built area
27,454 m2.