office building

OFFICE BUILDING AND INDUSTRIAL FACILITY AT THE P.C.T. OF GIJÓN, ASTURIAS

Description

The building meets the requirements indicated by the client, both in the industrial part and in the offices, since it reflects the needs of the production system in terms of raw material input, production process, storage-output of finished product, relationship between the industrial building and offices, and sizing of the administrative part for the necessary personnel.

 

Industrial Building. The building is conceived as a sober volume in which, responding to the functional needs of the industrial operation itself, does not detract from the formal quality of the facades. On the north, east and south facades (those to which the offices are not attached) there are three horizontal stripes, each with a different material: concrete panel, strip of translucent material (polycarbonate) and sandwich panel. The height of each material is determined by the height of the access gates to the building, which in turn respond to the operational needs of the industrial activity to be carried out inside.

 

The facade to which the offices are attached is a blind concrete panel intended to give prominence to the offices themselves and to meet the requirements of fire regulations, since the building is a different fire sector from the office sector. This continuous facade is used to place the company’s logo in a visible way.

 

The interior of the building is not compartmentalized; it is an open space. The structure of the building is not homogeneous throughout the floor plan: approximately half of the surface has gantries running north-south, while in the other half the gantries run east-west. This distribution of the structure reflects the company’s internal operational needs to optimize the production and storage process in combination with the loading-unloading points and overhead cranes.

 

Office Building. The offices are located on the west side of the building, attached to the industrial facility. The volume housing the offices has two floors above ground and one below ground. The purely administrative use takes place on half of the ground floor and on the first floor; the other half of the ground floor houses a workshop linked to the industrial building. The basement floor houses the changing rooms, dining room, training rooms, exhibition space and facilities.

The office facades are designed to faithfully reflect the administrative use taking place inside, with a more representative component within the overall building. These facades are the result of a climate analysis combined with the client’s request to achieve a sober and functional style.

 

The office roof is flat, and it will house the necessary air conditioning units as well as the skylights that bring natural light to the upper floor and the entrance hall on the access floor.

Services provided

  • Topographic Survey and Geotechnical Study
  • Basic Project
  • Execution Project
  • VR Modeling
  • Site Supervision

Project

OFFICE BUILDING AND INDUSTRIAL FACILITY AT THE P.C.T. OF GIJÓN, ASTURIAS

Developer

Ascensores Tresa, S.A.

Location

Polígono La Lloreda. Gijón. Asturias.

Project start date

2017

Project end date

2018

Project

Under Construction

Work completed