Convocatoria ANDALUCÍA: Ayudas a la inversión en instalaciones de generación de energía eléctrica y térmica con fuentes de energía renovable (IDAE)
Instituto para la Diversificación y Ahorro de la Energía – IDAE
At IMPULSO, we are pleased to inform you that the Ministry for the Ecological Transition and the Demographic Challenge, through the Institute for Energy Diversification and Saving (IDAE), will allocate €316 million to promote renewable installations for energy production, both thermal and electrical, throughout the national territory.
This aid programme is implemented through calls issued by IDAE in each autonomous community. It is already open in ANDALUSIA, and its purpose is to award, under a competitive tendering procedure, grants for investment projects in electricity generation installations using renewable energy sources (ELECTRICITY) or thermal energy production installations using renewable energy sources, including their management improvement and production optimisation equipment (THERMAL ENERGY).
Below is a summary of the main features of these grants:
BENEFICIARIES
Natural or legal persons, public or private (including energy service companies in the case of THERMAL ENERGY).
PROJECT TYPES
- ELECTRICITY: investment projects in electricity generation installations using biogas, biomass, wind or solar photovoltaic energy, which may include investment actions to improve management and optimise production, enabling self-consumption and the integration of energy into local markets, included in the following types of installations:
| Energy source | Type of action | Installed capacity limit |
| Renewable gases | Agro-industrial or industrial biogas (electricity generation and use) | Regardless of capacity |
| Agro-industrial or industrial biogas installations (electricity use only) | ||
| Biomass | Biomass (100% biologically sourced fuels) | |
| Wind | Onshore wind installation with hydrogen production/storage | Wind turbines with unit capacity > 100 kW |
| Small-scale wind installations | Wind turbines with unit capacity
10 < P ≤ 100 kW |
|
| Very small-scale wind installations | Wind turbines with unit capacity ≤ 10 kW | |
| Very small-scale wind installations for self-consumption with energy supply for charging electric vehicles | Wind turbines with unit capacity ≤ 10 kW | |
| Solar photovoltaic | Micro self-consumption WITHOUT storage | 10 kW ≤ P ≤ 100 kW |
| Small high-output installations for self-consumption WITHOUT storage in industry | 100 kW ≤ P < 1 MW | |
| Medium high-output installations for self-consumption WITHOUT storage in industry | 1 MW ≤ P | |
| Large high-output installations for self-consumption WITH storage in industry | 100 kW ≤ P ≤ 10 MW | |
| Self-consumption installations for seasonal industries WITHOUT storage | 100 kW ≤ P ≤ 10 MW | |
| Small-capacity installations for grid sale WITH storage | 100 kW ≤ P ≤ 1 MW | |
| Self-consumption installations WITH storage | 100 kW ≤ P ≤ 10 MW | |
| Self-consumption installations with energy supply for charging electric vehicles | 50 kW ≤ P ≤ 300 kW | |
| Photovoltaic installations with hydrogen | 1 MW ≤ P ≤ 10 MW | |
| Self-consumption installations WITH storage in Science and Technology Parks | 20 kW ≤ P ≤ 1 MW | |
| Self-consumption installations WITHOUT storage in companies/entities within the food distribution sector | 50 kW ≤ P ≤ 10 MW |
- THERMAL ENERGY: investment projects in thermal energy production installations using renewable energy sources and in renewable gas production installations, included in the following types of actions linked to renewable energies:
| Energy source | Type of action | Lower/upper limit of nominal capacity |
| Air-source heat pump | Air-source heat pump + photovoltaic services for air conditioning and air purification | ≥ 200 kW |
| Biomass | Industrial combustion chamber | ≥ 1 MW |
| Low-capacity industrial boilers | < 5 MW | |
| High-capacity industrial boilers | ≥ 5 MW | |
| Renewable gases | Biogas production plants including thermal generation for process use in high-capacity industrial applications | ≥ 5 MW |
| Boilers for thermal generation that use exclusively biogas as fuel | Regardless of capacity | |
| Biomethane (including purification only) | ||
| Geothermal or hydrothermal | Geothermal or hydrothermal services and industry | ≥ 100 kW |
| Geothermal direct use for thermal energy distribution network | ||
| Solar thermal | WITH concentration | 25 kW ≤ P < 5 MW |
| WITH concentration | ≥ 5 MW | |
| WITHOUT concentration | 25 kW ≤ P < 100 kW | |
| WITHOUT concentration | ≥ 100 kW |
ELIGIBLE COSTS
- ELECTRICITY: Preparation of the detailed design project, site supervision, health and safety coordination, main generation equipment, civil works, foundations, unloading and storage systems, electrical and control systems, hydraulic systems, pumping, instrumentation, metering, auxiliary equipment, monitoring, transport and assembly, commissioning, etc.
- THERMAL ENERGY: Preparation of the detailed design project, thermal response test trials, pumping tests, site supervision, health and safety coordination, main generation equipment, civil works, foundations, unloading and storage systems, heat/cold distribution systems to consumption points, grid injection systems, high-pressure compression and storage systems for compressed renewable gases, electrical and control systems, hydraulic systems, pumping, instrumentation, metering, auxiliary equipment, monitoring, transport and assembly, commissioning, etc.
PROJECT REQUIREMENTS
- Project duration: the installations must be fully completed before 30 June 2023.
- Incentive effect.
TYPE AND INTENSITY OF AID
Non-repayable grant that IDAE may advance to the beneficiary by means of an upfront payment.
The amount of the aid granted will be set out in the procedure’s decision in terms of unit amount and total amount.
The aid intensity will be calculated based on the eligible budget substantiated by the applicant, the actual installed capacity, as well as a minimum unit contribution to be established depending on the type of action.
SUBMISSION DEADLINE
The deadline for submitting applications is until 12:00 on 23 November 2020.
BUDGET ALLOCATION:
ELECTRICITY: €50,588,867.
THERMAL ENERGY: €73,700,000.