GRANTS FOR ENERGY AUDITS, MANAGEMENT SYSTEMS, AND ENERGY SAVING AND EFFICIENCY PROJECTS

Territorial scope of Galicia

At IMPULSO, we are pleased to inform you that the Galician Energy Institute (INEGA) has opened the application period for grants for the performance of energy audits, implementation of management systems, and energy saving and efficiency projects in companies within the industrial and service sectors for the year 2020. These are co-financed by the European Regional Development Fund under the Feder-Galicia 2014-2020 operational program, with the aim of advancing the evaluation and improvement of energy efficiency in companies. These grants have a total budget allocation of 3.5 million euros.

Below, we summarize the main characteristics of these grants:

BENEFICIARIES

Legally constituted companies and self-employed entrepreneurs, with a registered office or workplace in Galicia, included in the service or industrial sector (with the exception of the energy extractive industry, oil refining and biofuel, and electricity generation, transport, and distribution companies). As well as energy service companies that manage energy-consuming facilities.

PROJECT TYPES

  • Line I. Energy audits.
  • Line II. Implementation of certified management systems.
  • Line III. Energy saving and efficiency projects:
    • Investments (replacement or improvement) in energy-consuming equipment and facilities of the production process, as well as their auxiliary systems, with equipment and facilities that use high-efficiency technology or BAT.
    • Investments in existing heating and cooling production facilities intended to meet the health and hygiene demands of people, replacing them with high energy efficiency alternatives.
    • Improving the energy efficiency of existing lighting installations.
    • New cogeneration and biogas generation and consumption facilities that contribute to increasing the company’s energy efficiency.
    • Any other action involving a minimum energy saving of 20%.

PROJECT REQUIREMENTS

  • The minimum investment for the action to be eligible for a grant must be €10,000 per action (plus VAT), except in the case of energy audits, where the minimum investment will be €3,000 (plus VAT).
  • Incentive effect (projects must start after the grant application).

FINANCEABLE CONCEPTS

  • Line I: external costs of performing the audit.
  • Line II: cost of specialized consultancies, cost of the prior energy audit, certification expenses, and costs of energy consumption measurement equipment associated with the implementation of the management system.
  • Line III: investment costs necessary to achieve a higher level of energy efficiency.

TYPE AND INTENSITY OF AID

Non-refundable grant of 35% of the eligible cost of the action, with a maximum of €100,000 per project. In the case of small businesses, the aid intensity will increase up to 50% and up to 45% for medium-sized businesses. The maximum aid may be increased up to €1,000,000 for those actions involving high levels of energy savings.

Some aid lines granted to certain sectors will be considered de minimis. In all other cases, the maximum aid per company will be €1,000,000.

SUBMISSION DEADLINE

Currently open until 2020-02-20.