With a budget of €212 million, the application period will be open from January 28 to March 3
At IMPULSO, we are pleased to inform you that the Institute for the Diversification and Saving of Energy (IDAE) will imminently open the call for the PORT-EOLMAR PROGRAMME, concerning GRANTS FOR INVESTMENT PROJECTS FOR THE PHYSICAL ADAPTATION OF NATIONAL PORT INFRASTRUCTURE IN PORTS OF GENERAL INTEREST FOR THE DEPLOYMENT OF OFFSHORE WIND AND OTHER MARINE RENEWABLES IN SPAIN, intended to award grants, under a competitive tendering scheme, for investment projects for the physical adaptation of the basic national port infrastructure in ports of general interest, to provide them with the appropriate capabilities for the deployment of offshore wind and other marine renewable energies and their value chain in Spain.
The total budget for the call is €212M, distributed as follows:
- Northeast Atlantic Region: Bay of Biscay and Iberian Coasts Subregion (SGV): €100M
- Northeast Atlantic Region: Canary Islands Macaronesian Atlantic Subregion (SAMC): €30M
- Mediterranean Sea Region (RMM): €82M
Below is a summary of the main features of these grants:
BENEFICIARIES
The following may qualify as beneficiary entities:
- The Port Authorities belonging to the State-owned Spanish Port System, provided that their area of competence is a port of general interest.
- The groupings formed by port authorities which, with or without their own legal personality and adopting any of the forms provided for by law, may carry out the eligible actions.
To qualify as a beneficiary entity, the action for which the grant is requested must be included in the port authority’s current investment plan at the time the grant is awarded.
PROJECT TYPES
- Public investment actions consisting of projects for berthing port infrastructure (quays) and the creation of areas (land reclamation to create hardstanding areas), within Zone I, and in the land areas adjacent to Zone I, within the service area of these ports, with sufficient capacity to accommodate activities for the manufacture, assembly and dispatch of offshore wind turbines compatible with floating technology that may be developed under an open use/occupation regime for general use. Road access works and connections to general utilities will also be considered eligible, where necessary to enable the created areas that are not within the spaces to be granted under concession.
- Projects must include a commitment by private concessionaires to make an investment for the execution and operation of an industrial project with an overall investment equal to or greater than the amount of the grant requested for the infrastructure project.
- Applications for “multi-port” infrastructure projects will be accepted promoted by one or more beneficiary entities in different ports, provided that they are linked to the same overall industrial project that aligns the activities carried out in each of them.
The availability in the port of the required floating areas must be guaranteed for maritime operations and the temporary storage of floating parts and elements, in accordance with the technology and operating conditions associated with the proposed industrial projects.
PROJECT REQUIREMENTS
- As a result of the infrastructure project, the following minimum infrastructure capacity requirements must be ensured:
- Minimum number of berths: 1, at least 300 m
- Minimum length of the berthing line: 300 m
- Minimum draft at the quay and navigation channel: 15 m under maximum equinoctial spring low tide (BMVE) conditions.
- Minimum hardstanding area: 15 ha (for infrastructure projects located in the Canary Islands Macaronesian Atlantic Subregion, the minimum hardstanding area will be 10 ha).
For multi-port infrastructure projects, at least one of the affected port locations must ensure the following minimum infrastructure capacity requirements:
- Minimum length of the berthing line: 300 m
- Minimum draft at the quay and navigation channel: 15 m under BMVE conditions.
- Minimum hardstanding area: 10 ha
- Only actions whose execution start date is after February 1, 2022 will be accepted.
- Only eligible costs associated with investment items whose physical execution starts on a date after the registration date of the grant application in IDAE’s electronic office will be accepted.
- The actions financed under this call will comply with the “do no significant harm to the environment” principle (DNSH)
ELIGIBLE COSTS
The following will be eligible costs, provided that they are invoiced after the grant application is registered:
- Civil works construction costs, including dredging, foundations, quay structure and superstructure, equipment and commissioning of berths, land reclamation to create hardstanding areas, including the costs of materials, machinery and labour.
- Common network costs: main access roads and connections to general utilities necessary to enable the areas.
- Associated technical assistance (works supervision, environmental monitoring, health and safety coordination, quality control, etc.), as well as costs relating to affected assets and rights and, where applicable, environmental impact mitigation measures.
- Costs of preliminary studies and project drafting, including the studies required within the applicable environmental assessment procedures.
- Costs of projects involving demolition works necessary to extend the berthing line (provided that at least 70% is prepared for reuse, recycling and recovery).
- Costs for managing the grant application and justification, and the auditor’s report.
- Other items duly justified as necessary.
TYPE AND INTENSITY OF AID
Non-repayable grant.
The aid intensity will be calculated as the ratio between the total aid and the infrastructure project budget, and may reach up to the maximum percentage of 100% of the project’s eligible costs.
Compatible with other aid.
GUARANTEES AND ADVANCE PAYMENTS
Port authorities will be exempt from submitting a participation and project implementation guarantee.
In the case of an application for an advance payment of the grant, guarantees must be provided for an amount that must cover 100% of the advance requested plus interest at the statutory interest rate.
SUBMISSION DEADLINE
Application submission period: from 12:00 on Wednesday, January 28, 2026 until 12:00 on Tuesday, March 3, 2026.