REINDUS and COMPETITIVENESS 2018 Opens with Significant New Features.

Our success rate in previous calls is 100%.

We would like to inform you that the application period is now open for the 2018 Call for the REINDUSTRIALIZATION AND INDUSTRIAL COMPETITIVENESS PROMOTION PROGRAMS, issued by the MINISTRY OF INDUSTRY, TRADE AND TOURISM, for the granting of financial support for business investment in industrial development, with a budget of more than 400 million euros.

Below, we summarize the main features of these grants:

BENEFICIARIES

Companies that carry out, or are planning to carry out, industrial activity classified under Section C-Divisions 10 to 32 of the National Classification of Economic Activities (CNAE 2009). This also includes activities classified under section 38.3x, provided they hold a waste management authorization at the time of application, and the project to be carried out is classified as belonging to the following recovery operations: R2, R3, R4, R5 (excluding soil remediation), R6, R7, R8, R9, R11, as defined in Annex II of Law 22/2011, of July 28, on waste and contaminated soils.

TYPES OF PROJECT

  • Creation of industrial facilities.
  • Relocation of industrial facilities.
  • Improvements and/or modifications to production lines.
  • Productive implementation of “Connected Industry 4.0” technologies. (NEW)

 

PROJECT REQUIREMENTS

  • Investment execution period: from January 1 of the call year until 18 months after the final grant resolution.
  • Minimum budget for the latest call: €100,000.
  • Private financing: at least 25% of the investment.
  • Creation and relocation: civil works + construction ≤ 70% of total eligible budget.
  • Improvements and/or modifications to production lines: civil works + construction ≤ budget for production apparatus and equipment. Production process engineering ≤ 30% of budget for production apparatus and equipment.
  • Productive implementation of “Connected Industry 4.0” technologies: civil works + construction ≤ budget for production apparatus and equipment. Production process engineering ≤ budget for production apparatus and equipment.

 

ELIGIBLE EXPENSES

  • Civil Works: site development and conduits, expressly excluding land.
  • Construction: acquisition, building, expansion, or refurbishment of industrial buildings, as well as their facilities and equipment not directly related to the production process.
  • Production apparatus and equipment, excluding outdoor transport elements. These may be new or used.
  • Production process engineering: in-house staff, materials, and external collaborations required for process design and/or redesign.

 

TYPE AND INTENSITY OF SUPPORT

Loan of up to 75% of the eligible budget with 10-year repayment period and a 3-year grace period at a fixed interest rate of around 1.647%, with guarantees required at the time of granting of 10%, 41%, or 70% depending on the financial-economic assessment. (NEW)

Why is Reindus financing more advantageous than bank financing?

  • The main reason, it does not count toward CIRBE, meaning it does not factor into the company’s financial risk assessment.
  • In terms of term: the repayment period is 10 years with a 3-year grace period, during which only interest would be paid.
  • Due to the fixed interest rate: The payment is annual, which avoids committing the company’s liquidity on a monthly basis.
  • In terms of investment planning: it allows financing investments made from 01/01/2018 up to 18 months after receiving the grant resolution (approximately April 2020). There is no need to commit resources prior to obtaining the loan. You can wait to receive the funds and then make the investment.
  • In terms of cost:
  • No notarial intervention is required.
  • There is no need to attend any signing. At the end of the year, the Public Treasury directly issues a transfer to the account previously designated during the application process.
  • There are no associated costs such as processing, origination, or partial or total cancellation fees.

APPLICATION PERIOD

From 12/21/2018 to 01/31/2019